EICR observation codes: C1, C2, C3 and FI

On an EICR, C1 means danger present, C2 potentially dangerous, C3 improvement recommended and FI further investigation required; a C1 or C2 makes the report unsatisfactory and remedial work is due within 28 days (or any shorter period the report specifies).

Last checked: 18 October 2026

The codes on an EICR

An Electrical Installation Condition Report (EICR) records its findings against a fixed set of outcome codes. The meanings below are from GOV.UK guidance on electrical safety standards in the private and social rented sectors.

  • C1: "Danger present. Risk of injury."
  • C2: "Potentially dangerous."
  • C3: improvement recommended. It "does not indicate remedial work is required".
  • FI: "Further investigation required without delay."
  • N/V, LIM and N/A: the other outcomes available on the report.

Which code a defect receives is the inspector's decision. This page cannot tell you whether a particular defect is a C1 or a C2.

When a report is unsatisfactory

If codes C1 or C2 are identified in the report, remedial work will be required, and the report states that the installation is unsatisfactory for continued use.

  • The remedial or further investigative work is due within 28 days, or any shorter period the report specifies.
  • Written confirmation of the work goes to the tenant and to the local council within 28 days of completing it.
  • The report itself goes to the tenant within 28 days of the inspection, and a new tenant gets it before they occupy.

These rules are from the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, as GOV.UK guidance describes them. They are general information, not advice on a specific property.

What the IET says about FI under Amendment 4

The current amendment of BS 7671 is A4:2026. The IET states that under Amendment 4, for the EICR, it is clarified that issuing an FI code for further investigation should not result in an unsatisfactory outcome.

That sentence is about the FI code only.

How NexCert records the codes

NexCert issues the EICR for domestic installations up to a 100 A supply, with a 12-section schedule, and a separate commercial EICR. The engineer records observations against the codes above on site.

When a C1 is recorded on an EICR or a Domestic Visual Condition Report, NexCert raises an Electrical Danger Notice automatically. The notice tells the responsible person that danger is present and what action was taken.

The certificate pages: EICR (domestic), EICR (commercial), Domestic Visual Condition Report.

General information about public law and standards, not advice on a specific installation or property. Which code, certificate or interval applies to a particular installation is for the qualified person who inspects it.

/ FAQ

Common questions

What are the EICR observation codes?

The codes recorded on an EICR are C1, C2, C3 and FI, plus N/V, LIM and N/A.

What does a C1 mean?

GOV.UK guidance describes C1 as "Danger present. Risk of injury." In NexCert, a C1 on an EICR or a Domestic Visual Condition Report raises an Electrical Danger Notice automatically, which tells the responsible person about the danger and the action taken.

What do C2 and C3 mean?

GOV.UK guidance describes C2 as "Potentially dangerous." A C3 means improvement is recommended, which "does not indicate remedial work is required".

Does a C1 or C2 make an EICR unsatisfactory?

Yes. GOV.UK guidance says that if codes C1 or C2 are identified, remedial work will be required and the report states that the installation is unsatisfactory for continued use.

How long is the remedial work allowed to take?

Within 28 days, or any shorter period the report specifies. Written confirmation of the work goes to the tenant and the local council within 28 days of completing it. This is general information about the regulations, not advice on a specific property.

What does an FI code mean?

GOV.UK guidance describes FI as "Further investigation required without delay." The IET states that under BS 7671 Amendment 4, issuing an FI code for further investigation should not result in an unsatisfactory outcome.

Can this page tell me which code my defect should get?

No. Which code a defect receives is the inspector's decision. This page does not say whether a particular defect is a C1 or a C2.

When does the tenant get the report?

The tenant receives the report within 28 days of the inspection. A new tenant gets the report before they occupy the property.

How often does a rented property need an EICR?

Under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, an EICR is needed on every fixed installation at least every 5 years, by a qualified person. See how often each certificate is due.